top of page

Carl Berner 2011-12 | studio

I finally got a chance to rent a laundry room in the block where I lived. It was inexpensive, much space, had running water and I could dry my filler paintings on the radiators in the old drying cabinets. It was perfect. The first paintings I did there was the striped ones for the second exhibition at Henrik Gerner.

In 2012 i had to temporary leave the studio again. It was a difficult time for me in many ways.

bottom of page